Local Authorities

Workers in high-visibility shirts assembling steel frames of a temporary flood barrier along a suburban road, with a forklift and stacked components nearby Australia

Rockhampton Flood 2026: Council Puts Its Barrier Up Before the Peak

During the Rockhampton flood of January 2026, the regional council put its temporary Geodesign barrier up along Water Street while the Fitzroy River was still rising, then removed it afterwards.

Read more
2000 _ Arvika, Sweden-7 Sweden

Arvika Flood 2000: How a Mobile Barrier Changed Emergency Flood Defence

In November 2000, the Swedish town of Arvika faced its worst flooding in living memory and turned to Geodesign's Pallet Barrier alongside the rescue services, the Armed Forces and the Home Guard.

Read more
Membre-Vresse-Hero Belgium

Flood Protection in Belgium: Riverside Barriers on the Semois

The Belgian municipality of Vresse-sur-Semois has used Geodesign Heavy Duty C152 barriers during high water to hold back the River Semois at three riverbank locations in Vresse and Membre.

Read more
Normandy-received-protection-against-severe-flooding France

France Floods: How Louvigny’s Barriers Held Back the Orne During Storm Herminia

In late January 2025, as Storm Herminia pushed the Orne over its banks in Normandy, the town of Louvigny near Caen put up its Aqua Barrière flood barriers in time.

Read more
Berserker’s Geodesign Barrier Shields Rockhampton Homes from Historic Flood (1) Australia

Rockhampton Flood 2017: How a Temporary Levee Kept Berserker Homes Dry

When the Fitzroy River rose after ex-Tropical Cyclone Debbie in April 2017, a Geodesign temporary levee kept streets dry in Berserker, on Rockhampton's north side.

Read more
Louvigny Demonstrates the Effectiveness of Geodesign Barriers in Flood Defense Exercises-1 France

Louvigny’s Flood Barrier Deployment Exercise: Rehearsing for the Orne

Louvigny, near Caen in Normandy, rehearses putting up its Heavy Duty barrier line along the River Orne, keeping municipal staff trained and the equipment checked.

Read more
Securing Maryborough’s CBD- A Chronicle of Flood Preparedness and Resilient Defense (1) Australia

Maryborough CBD Flood Levee: How Training Protected the Town Centre

Maryborough's CBD flood levee in Queensland, a Geodesign Heavy Duty temporary barrier, was rehearsed in 2019 and, after a setback in January 2022, kept floodwater out of the town centre a few weeks later.

Read more
Witney Welcomes Prime Minister to Showcase Geodesign Barrier’s Potential United Kingdom

Witney Flooding: Prime Minister Joins Residents’ Barrier Training

When Witney residents were given their own temporary Geodesign barrier, their MP – then Prime Minister David Cameron – joined the training day in the West Oxfordshire town.

Read more