A plan that only exists in someone’s head fails at 2am. This template gives you the structure — triggers, roles, sequence, and the decisions that have to be made before the water arrives — built around the way flood warnings actually work in Australia.

  1. Tell us where to send it
  2. Fill in your site, gauges and crew
  3. Walk it through before the season
  • Free, no strings
  • Built for Australian warning levels
  • Editable — make it yours
  • Works with any barrier system
  • 30+ years of deployments behind it
Free Download

Send Me the Template

Request the template and a specialist will send it to your work email. No follow-up sequence, and no sales call unless you ask for one.

This field is for validation purposes and should be left unchanged.
Free Editable format No sales sequence

We collect these details to send you the template and to answer any questions you raise. We do not sell your information. See our Privacy Policy for how we handle personal information, including how to access or correct it.

Office Contact Information

The template

Flood Emergency Response Plan

Format

Editable document and PDF

Cost

Free, and yours to edit

Written for

Councils, utilities, infrastructure and industrial sites

Warning framework

Bureau of Meteorology and state SES

What is in the template

Nine sections, each one a question a plan has to answer before an event rather than during one. Fill in what applies to your site and delete what does not.

  • Site and asset summary. What is being protected, what it is worth to lose, and what the flood source is.
  • Trigger levels. The gauge, the heights, and what happens at each one. This is the section most plans are missing.
  • Roles and contacts. Who decides to deploy, who calls the crew, who talks to the SES and the council, and who does it when they are on leave.
  • Deployment sequence. The order the line goes in, how long each stage takes, and what has to be finished before the water arrives.
  • Equipment and storage. Where the system lives, how it gets to the line, and what else the crew needs — pumps, lighting, plant, PPE.
  • During the event. Monitoring the line, managing seepage, and the conditions that would make you pull people back.
  • Stand-down and recovery. When it is safe to open the line, how the system is cleaned, checked and returned to storage.
  • Training and exercises. Who has been trained, when they last deployed it, and when the next dry run is.
  • Review log. What changed after the last event, and who signed off on it.

The section people skip

Trigger levels. It is easy to write “deploy when flooding is expected” and much harder to write “at 4.2 metres on the upstream gauge, call the crew; at 4.8 metres, start the line”.

The difference matters because deployment takes hours and the decision has to be made before anyone can see water. A plan without numbers pushes that decision onto whoever happens to be on shift, at the worst possible moment.

Our guide to flood monitoring and lead time walks through how to set those numbers for your gauge and your deployment time.

Built around Australian warning levels

The Bureau of Meteorology issues the flood forecasts and warnings; your state SES turns them into community warnings on the Australian Warning System. The template maps your own actions onto those three levels, so the plan speaks the same language as the alerts your team will actually receive.

  • Advice. An incident has started; there is no immediate danger. In the template: confirm the crew roster, check the gauge, and verify the equipment is accessible.
  • Watch and Act. A heightened level of threat — conditions are changing and action is needed now. In the template: this is normally where deployment starts, because waiting for the next level rarely leaves enough time.
  • Emergency Warning. The highest level. In the template: the line should already be closed, and the focus shifts to monitoring, seepage and crew safety.

Why this matters for a plan

Warning levels tell you about danger to people. They do not tell you when your barrier has to be up — that depends on your gauge, your line length and your crew.

The template keeps both columns side by side: the public warning level, and your own trigger. That is what stops a team from waiting for an Emergency Warning that arrives after the window to deploy has closed.

Common questions

Do I have to be a Geodesign customer?

No. The template is written around deploying a temporary barrier line, but the structure works whatever system you use — including sandbags. We would rather Australian sites had good plans than no plans.

What format does it come in?

You get an editable Word document and a PDF of the same plan. The Word file is the one you fill in and keep updating; the PDF is for circulating and for printing the copy that sits in the control room.

Will I get a sales call?

No. You get the template and nothing else unless you reply. If you want the filled-in plan reviewed, say so and Clay will read it.

Is this a substitute for a council or SES plan?

No, and it is not meant to be. Local flood plans deal with the community; this deals with your site — your gauge, your line, your crew and your assets. It should sit alongside the local plan, not replace it, and it should be shared with your council or SES contact so everyone knows what you intend to do.

How often should the plan be reviewed?

At least once before each wet season, and again after any event where you deployed. Contact lists go stale faster than anything else in the document, and a wrong phone number at 2am is the same as no plan.

Where do I start if I have no plan at all?

With the site, not the document. Our guide to building a flood emergency response plan walks through the thinking, and the flood risk assessment guide covers how to work out what you are actually exposed to.

Once the plan is written

A plan is only as good as the lead time and the equipment behind it.

Match it to your site

A free site assessment gives you the barrier length and deployment time the plan depends on.

Book a site assessment →