Site Assessment — Australia

Book a Flood Site Assessment

Before you can budget for flood protection you need to know two numbers: how high the water gets, and how long a line you have to close. A site assessment gives you both, along with a barrier layout that fits the ground you actually have.

  1. Tell us about the site
  2. We review levels, ground and access
  3. You get a layout, a length and a next step
  • No cost, no obligation
  • FM Approved — ANSI/FM 2510-2020
  • 30+ years in the field
  • Deployed across Queensland
  • Reply within two working days
Free Site Review

Request a Site Assessment

The more you can tell us about the site, the more useful the first answer will be. Anything you are unsure of, leave as "not sure" — that is what the assessment is for.

This field is for validation purposes and should be left unchanged.
No obligation Specialist review Reply within two working days

We collect these details only to assess your site and respond to your request. We do not sell your information. See our Privacy Policy for how we handle personal information, including how to access or correct it.

Office Contact Information

Australia

Every state and territory

Response time

Two working days

Cost

No charge, and no obligation to buy

What the assessment covers

This is an engineering conversation, not a sales call. The point is to work out whether a demountable barrier is the right answer for your site — and if it is, what shape it takes.

  • The line you need to close. Where the water comes in, where it goes around, and how many metres of barrier that actually means once the low points are accounted for.
  • Protection height against your flood levels. Working from your flood study, council mapping or past event marks, and which barrier series that puts you in.
  • The ground it stands on. Sealed surfaces, gravel, grass, kerbs, service pits, slopes and corners all change the layout and the anchoring approach.
  • Seepage and what sits behind the line. A barrier holds the river back; it does not stop water arriving from underneath. We look at that honestly — see our guides on managing seepage and sand boil control.
  • Who deploys it, and how long they have. Crew size, deployment time and the warning time you can realistically count on — the subject of our guide to flood monitoring and lead time.
  • Storage and handling. Where the system lives for the 360 days a year it is not deployed, and how it gets to the line when it is needed.

What you get back

A written summary with a recommended barrier series and protection height, an indicative barrier length in metres, the deployment approach for your crew, and the things we could not settle from a desk review.

If the honest answer is that a demountable barrier is not right for your site — where a permanent structure makes more sense, for instance — we will say so. We would rather lose a sale than be the reason a plan fails on the night.

If you are still working out how exposed the site is, start with our guide to flood risk assessment and site vulnerability, then come back.

Common questions

Does someone come to the site?

Most assessments start as a desk review — drawings, levels, aerial imagery and photographs get us a long way, and it is faster for you. Where a site is complex or large, we will discuss an on-site visit and who from your side needs to be there.

What does it cost?

The assessment is free and carries no obligation. We do it because a barrier specified against the wrong height or the wrong length helps nobody, least of all us.

What do I need to have ready?

Nothing mandatory. Useful, in rough order: a site plan or aerial view with the line marked, known flood levels from a flood study or council mapping, photographs of the ground along the line, and any past event photos. If you have none of it, send the form anyway and we will work out what is needed.

Is this the same as a flood risk assessment?

No. A flood risk assessment establishes how exposed a site is and how deep the water gets — that is engineering work you or a consultant does, and our guide to it explains how. A site assessment starts where that finishes: given those levels, what barrier goes where.

How long does it take?

Clay responds within two working days, usually with questions. How quickly you get a layout after that depends mostly on how quickly the site information comes back.

We are mid-procurement. Can you work to a tender timeline?

Yes. Tell us the closing date in the form and we will work to it. Our contact page sets out how procurement through the National Emergency Management Stockpile panel works.

Not ready for an assessment yet?

Start where it makes sense for your site.

Understand the risk

Work out how exposed the site is and how deep the water gets before you specify anything.

Read the guide →

Compare barrier types

See how demountable steel barriers stack up against sandbags, water-filled and permanent options.

Compare systems →

Just have a question

Technical, commercial or procurement — send it to the right person directly.

Contact us →