Industrial

ASML Fortifies Silicon Valley Campus Against 500-Year Floods with FM Approved Barriers USA

Semiconductor Facility Flood Protection at ASML’s San Jose Campus

In November 2024, ASML prepared its research and development campus in San Jose, California, for a severe Guadalupe River flood, combining Industrial P101 barriers, live river data and hands-on staff training.

Read more
Romsey’s Swift Action Against Unprecedented Rains United Kingdom

Romsey Flooding in 2020: Industrial P101 Barriers Along the River Test

In February 2020, as Storm Dennis brought heavy rain to Hampshire, the Environment Agency and its partners used around 800 m of Geodesign Industrial P101 barriers to protect homes and businesses in Romsey.

Read more
Defending Ilkley from the Ravages of Storm Dennis (1) United Kingdom

Defending Ilkley Against Storm Dennis: A Multi-Agency Response

On 15 February 2020, as Storm Dennis pushed the River Wharfe higher, soldiers, Bradford Council and the Environment Agency built a 700 m Industrial P101 barrier line in Ilkley.

Read more
Ribchester’s Resilience – A Tale of Two Floods United Kingdom

Ribchester Flooding: A Twice-Flooded Village Prepares for the Next Storm

After Ribchester in Lancashire flooded on Boxing Day 2015 and during Storm Ciara on 9 February 2020, the Environment Agency put up an Industrial P101 barrier there on 14 February.

Read more
Enhanced Flood Protection in Leatherhead – Geodesign P101 Barriers Deployed United Kingdom

River Mole Flooding: A Temporary Barrier for Leatherhead Homes

The Environment Agency's temporary defence plan for Leatherhead in Surrey, first used in December 2019, sets out 340 m of Industrial P101 barrier to protect up to 28 homes and businesses.

Read more
Storm Ciara’s Aftermath Billington Takes Precautionary Measures with Geodesign Barriers Ahead of Storm Dennis United Kingdom

After Storm Ciara: Billington Protected Before the Next Storm

Five days after Storm Ciara flooded dozens of homes in Billington, Lancashire, on 9 February 2020, the Environment Agency put up an Industrial P101 barrier on Longworth Road.

Read more
Geodesign Barriers Aid in Flood Management in Bradford-on-Avon, West Wiltshire United Kingdom

Bradford on Avon Flooding: Volunteers and a Barrier at the Bullpit

When the River Avon rose, the Environment Agency set up 50 m of Industrial P101 temporary barrier at the Bullpit in Bradford on Avon, Wiltshire, while Community Emergency Volunteers kept watch.

Read more
British Authorities Ramp Up Winter Flood Defenses with 40 km of Barriers and Military Assistance (1) United Kingdom

Environment Agency Stocks 40 km of Temporary Barriers for Winter

Ahead of winter 2016–17, the Environment Agency built up a 40 km stock of temporary barriers, including Geodesign Industrial barriers, and trained soldiers to help put them up.

Read more
Operation Certis Takes Centre Stage- Geodesign Barriers Integral to Environment Agency’s Winter Flood Defense United Kingdom

Exercise Certus: Environment Agency Rehearses Its Winter Flood Response

On 11 and 12 October 2016, the Environment Agency ran Exercise Certus, a national flood response rehearsal that included live testing of pumps, drones and temporary barriers at Shoreham-by-Sea, West Sussex.

Read more
United Kingdom

Storm Christoph: Boris Johnson Praises Environment Agency Response in Didsbury

On 21 January 2021, as Storm Christoph brought record river levels to Greater Manchester, then Prime Minister Boris Johnson visited Didsbury to thank the Environment Agency for its overnight work.

Read more