A plan is what turns a warning into an action. This template gives you the nine sections a working flood plan needs, and the arithmetic behind the section most plans get wrong — the trigger. Public flood warnings in most countries arrive with less notice than a barrier line takes to build, so the warning cannot be the thing that starts your deployment. Read the full guide to response planning first if you want the reasoning behind each section.

  1. Tell us where the site is
  2. We email the template straight away
  3. Fill it in — an hour gets a usable draft
  • Editable Word document plus PDF
  • Any country, any warning service
  • Works with any barrier system
  • Free, and no obligation to buy
  • Written from 30+ years of deployments

Flood warning already in force? Email contact@geodesignbarriers.com and mark it urgent.

Free Download

Get the Template

Six fields. We email the template immediately — Word and PDF in the same message.

This field is for validation purposes and should be left unchanged.
Also send me occasional emails about flood protection — case studies, guidance changes and product news. Optional, and you can unsubscribe in one click.
No charge Word and PDF No sales call unless you ask

We collect these details to send you the template and to understand who is using it. We do not sell them, and we will not add you to a marketing list unless you tick the box above. See our Privacy Policy for how we handle personal data.

What's in the template

Nine sections, in the order you'll need them

Each section is a page or less, with prompts rather than blank space. The order matters: it follows the sequence of an actual flood, from the first forecast to the debrief three weeks later.

The site and what you're protecting

Address, grid reference, the barrier line, what sits behind it and what it costs you per day if the site goes down. The last number is what gets the plan funded.

Trigger levels

The gauge, the marker or the forecast reading at which each action starts — set against the official warning levels, not instead of them. This is the section that decides whether the plan works.

Roles and contacts

Who decides, who deploys, who tells everyone else — with a named deputy for each, because floods do not check the annual leave rota.

Deployment sequence

The order the line goes up, section by section, with the time each part takes and the point of no return after which the last vehicle has to leave.

Equipment and access

What you hold, where it is stored, how it reaches the line, and what has to be moved out of the way first. Includes pumps, sandbags and demountable defences, not only our systems.

During the event

Watch rotas, what to check and how often, seepage and sand boils, pumping, and the criteria for calling it and evacuating.

Stand-down and recovery

When it is safe to take the line down, in what order, how to clean and inspect before storage, and what to do about contaminated water.

Training and exercises

Who has been trained, when they last put the barrier up for real, and the date of the next exercise. A plan nobody has rehearsed is a document, not a defence.

Review log

Version, date, who changed what and why — including what you learned from the last event. Auditors ask for this, and so do insurers.

The template does not tell you which barrier to buy. If you do not yet know what your site is exposed to, start with the guide to assessing flood risk; if you know the exposure but not the system, compare the three series.

Warnings and triggers

A flood warning is not a deployment trigger

Every country names its warning levels differently, but the operational problem is the same everywhere: the message that says flooding is expected usually arrives with less notice than a barrier line takes to build. The template holds the official level and your own trigger side by side, so a team is never waiting for a message that comes after the window has closed. Section 2 asks you to do this arithmetic first.

Working out the notice your site actually needs
Add up What it means Worked example
Deployment time How long your line takes to build — measured, not estimated, and with the crew you can actually get at three in the morning rather than the one you have on a training day. 6 hours
Call-out time From the moment someone decides to deploy to the moment the crew and the equipment are both on site. 2 hours
Margin Darkness, weather, the gate that is locked, the one panel that will not seat. Every real deployment spends some of this. 2 hours
The notice you need The sum. If your national warning service gives you less than this, the warning cannot be your trigger — you need a reading further upstream that reaches you earlier.This is the number section 2 is asking for 10 hours

The figures above are an illustration, not a specification — yours will be different, and the point of the exercise is to find out by how much. For how to measure each of the three, and how to buy yourself more notice, see flood monitoring and lead time.

Where your three numbers come from

  • Deployment time A timed drill on your own line. If you have never timed one, a site assessment will give you the figure.
  • Notice available Your national or regional flood warning service, plus the gauge or upstream marker your site actually watches. The published warning lead time is the floor, not the number to plan on.
  • Margin Your own debriefs. Every deployment that has already happened at your site is data; the review log in section 9 is where it accumulates.

The section people skip

Almost every flood plan we are shown has section 2 half-finished. It says something like “deploy barriers when flooding is likely”. That is not a trigger. Nobody can act on it at three in the morning, and nobody can be held to it afterwards.

A trigger is a number and a place: when the gauge at the road bridge reads 2.4 m and is still rising, the duty manager calls out the deployment team. It works because two people reading it at different times reach the same decision. It also works when the warning never arrives — and warnings do fail, or arrive for the wrong watercourse, or land in an inbox at the weekend.

Setting the number takes a conversation with whoever watches the water, and it takes knowing how long your own line takes to build. If you do not know that second figure, you cannot set the first one — which is why the template asks for deployment times in section 4 before it asks you to finalise section 2. A site assessment will give you the deployment time if you have never timed it.

Office Contact Information

Headquarters

Geodesign Barriers, Sweden

Coverage

24 countries

Response time

Two working days

Geodesign Barriers is a Swedish manufacturer. Barriers are supplied through our own offices and a distributor network across 24 countries, and site work is carried out by the partner for your market — the contact page routes you to the right team.

Questions

Before you download it

Is the template really free?

Yes. Give us a name, a work email and a few details about the site and we email the template. There is no charge and no obligation to buy anything. We ask for the details because knowing who uses the plan is how we improve it.

What format does it come in?

An editable Microsoft Word document, so you can put it on your own letterhead and change anything that does not fit, plus a PDF for circulating the finished plan to people who only need to read it.

Does it work in my country?

Yes. The template does not assume any particular warning service, because they differ everywhere and some regions have none at all. Section 2 asks for your own gauge or upstream marker and the reading at which each action starts, then asks you to record the official warning levels alongside it. A site with no public warning service fills in the same section; it simply has one column instead of two.

Is this a flood risk assessment?

No. A site-specific flood risk assessment is a planning document prepared by an independent consultant for your local planning authority. This is an operational plan for a site whose flood risk you already understand: who does what, when, and in what order. If you need the assessment, our guide to assessing flood risk explains the difference and where to start.

Do I need Geodesign barriers to use it?

No. The template is written around any temporary barrier system, and the equipment section has room for sandbags, pumps and demountable defences. We make flood barriers and would like to sell you some — but the plan is worth having whether or not you buy from us.

How long does it take to fill in?

An hour gets you a usable draft of most sections. The trigger levels take longer, because they need a real gauge reading or an upstream marker rather than a general intention to act early — and that usually means a conversation with whoever watches the water.

Can someone look at our plan once it's written?

Yes, and we would rather you asked. Send the filled-in plan to contact@geodesignbarriers.com and we will go through the trigger levels and the deployment sequence with you. There is no charge for that either, and no sales call unless you ask for one.

Once the plan is written

Four things that turn a filled-in template into a defence that actually goes up.

The Full Guide

The reasoning behind every section, and the mistakes that stop plans working when it matters.

Read the guide →

Monitoring & Lead Time

How to work out how much notice your site really gets, and how to buy yourself more of it.

Read the guide →

Site Assessment

We measure the line, the height and the ground, and tell you how long your deployment actually takes.

Book an assessment →

Something Else

Pricing, a technical question, a tender, or an event already under way — the contact page routes it.

Contact us →