FM Approved

Flood Barriers
for sites worldwide

Deployable barriers for municipal, industrial, infrastructure and commercial sites

Geodesign flood barriers are deployable systems for planned temporary flood protection. Deployed in 24 countries, with more than 164 km of barrier installed. The Industrial and Heavy Duty series are FM Approved to ANSI/FM 2510-2020.

FM Approved No Fill Materials No Anchoring Free-Standing Design
30+ Years
Flood protection experience
3 Series
Elemental, Industrial, Heavy Duty
Local partners
Support and deployment planning in your region
Flood Barrier Systems

Deployable flood barrier systems for sites worldwide

Geodesign flood barriers are deployable, reusable flood barrier systems for municipal, industrial, commercial and critical-infrastructure sites. They are designed for planned temporary flood protection without sandbags, fill materials, excavation or permanent flood walls, and they are shipped and supported internationally from our head office in Sweden and a network of regional partners.

The system uses modular supports, panels, and a protective membrane that stabilises through geometry, self-weight, and hydraulic loading. For teams comparing sandbags, water-filled barriers, flood gates, flood walls, and no-fill deployable systems, see our flood barrier comparison guide.

Industrial and Heavy Duty series FM Approved to ANSI/FM 2510-2020 — independent third-party verification
Product Series

Choose the right flood barrier series

Three product series make it easier to match the right barrier system to your required protection height, site conditions, and deployment scenario.

ELEMENTALFlood Barrier

A streamlined barrier system

Protection height 41 – 61 cm (16 – 24 in)
  • Best for lower protection heights and rapid deployment
  • Simplified system with fewer components
  • Ideal for smaller sites and quick-response scenarios
  • Same modular components and deployment method as the larger series

INDUSTRIALFlood Barrier

Scalable modular system

Protection height 61 – 121 cm (24 – 48 in)
  • Best for scalable municipal and commercial protection
  • Optimised for moderate-to-significant flood events
  • Modular components for flexible site coverage
  • FM Approved to ANSI/FM 2510-2020

HEAVY DUTYFlood Barrier

Maximum protection height

Protection height 122 – 245 cm (48 – 96 in)
  • Best for severe flood events and higher protection levels
  • Built for challenging site conditions
  • Engineered for critical infrastructure and high-value assets
  • FM Approved to ANSI/FM 2510-2020
Set-up time by model — 100 m (330 ft) of barrier with a six-person crew
Series Model Protection height Weight per section Set-up time
Elemental E41 41 cm (16 in) 10 kg (22 lb) 30 min
E51 51 cm (20 in) 10.5 kg (23 lb) 30 min
E61 61 cm (24 in) 14 kg (31 lb) 30 min
Industrial P61 61 cm (24 in) 17 kg (37 lb) 35 min
P81 81 cm (32 in) 22 kg (49 lb) 50 min
P101 101 cm (40 in) 27 kg (60 lb) 50 min
P121 121 cm (48 in) 33 kg (73 lb) 1 h 10 min
Heavy Duty C122 122 cm (48 in) 66.5 kg (147 lb) 50 min
C152 152 cm (60 in) 78.4 kg (173 lb) 55 min
C184 184 cm (72 in) 101.1 kg (223 lb) 1 h 25 min
C213 213 cm (84 in) 117 kg (258 lb) 1 h 45 min
C245 245 cm (96 in) 140.8 kg (310 lb) 2 h 10 min
Not sure which series is right for your site?
Tell us about your site and we'll recommend the right barrier series and next step.
Get a Flood Barrier Recommendation →

Proven integrity.
The Industrial and Heavy Duty series are FM Approved — certified to ANSI/FM 2510-2020 for independent, third-party verification. See certifications for the scope of the approval.

Use Cases

Flood protection for municipal, industrial, and commercial applications

Geodesign flood barriers are designed for organisations that need rapid deployment, dependable flood performance, and site-specific adaptability across a range of real-world conditions.

Municipal Flood Protection

Protect roads, public spaces, town centres, and community infrastructure.

Emergency Response

Support rapid temporary flood protection when rising water threatens access routes and critical sites.

Commercial Property Protection

Reduce flood risk around facilities, business-critical assets, and site boundaries.

Industrial Sites

Create temporary protection around equipment, operations, and vulnerable plant areas.

Utilities & Infrastructure

Protect utility assets and infrastructure corridors where continuity is essential.

Critical Assets

Protect sensitive public and private assets where downtime, access loss, or flood damage is unacceptable.

Deployments

Real-world deployments

Field-proven flood protection in real flood conditions in Europe, North America and Australia. Geodesign barriers have been deployed against river floods, coastal storms and cyclonic flooding, and used to protect airports, town centres and critical infrastructure — showing how a reusable, temporary flood barrier system performs when water is rising and site teams need fast, repeatable protection.

Ironbridge, UK

Long-term Environment Agency flood protection programme along the historic River Severn waterfront.

Maryborough, Australia

Major regional flood protection — town centre deployment during Queensland flooding.

Membre, Belgium

Riverside flood protection along the Semois during seasonal high water.

Rockhampton, Australia

Airport and infrastructure flood protection during prolonged regional flooding.

Myrtle Beach, USA

Hurricane Florence coastal flood deployment — perimeter protection during a real flood event.

Deployment

How Geodesign flood barriers are deployed

Geodesign barriers are assembled through a repeatable step-by-step process using modular components — with no specialised tools or fill materials required.

1

Place and Lock Supports

Place A-frame supports along the intended barrier line and lock them into position.

2

Connect with Link Bars

Slide the link bars into the supports to establish alignment and structural continuity.

3

Mount Panels

Install the panels onto the link bars to form the structural barrier face.

4

Roll Out the Membrane

Position the liner over the barrier face and add chain ballast as needed.

5

Self-Anchor Under Flood Loading

As water rises onto the liner, the system stabilises through geometry, self-weight, and hydraulic loading.

No tools. No fill materials. Scalable deployment.

Ready to deploy at your site?
Tell us about your project — we'll recommend the right barrier and walk you through deployment.
Get a Flood Barrier Recommendation →
Why Geodesign

Why teams choose Geodesign flood barriers

Geodesign barriers are engineered for rapid deployment, dependable flood performance, and site-specific adaptability — with an FM Approved design — Industrial and Heavy Duty, PR453294 — that stabilises through geometry, self-weight, and hydraulic loading without fill materials or permanent anchoring.

FM APPROVED

Certified to ANSI/FM 2510-2020 for verified performance under demanding flood conditions.

FAST DEPLOYMENT

Manual, step-based assembly with no specialised tools or machinery required.

NO FILL MATERIALS

No sand or water required. Stability is achieved through system geometry, self-weight, and hydraulic loading.

FREE-STANDING DESIGN

No permanent anchoring, excavation, or ground penetration required under normal deployment.

BUILT FOR REAL SITES

Designed to accommodate uneven surfaces and non-linear alignments.

REUSABLE SYSTEM

Engineered for repeated deployment and long-term lifecycle performance.

FM APPROVED

The Industrial and Heavy Duty series are FM Approved to ANSI/FM 2510-2020, Approval Identification PR453294 — independent third-party verification of structural performance.

See if Geodesign is the right fit for your site

Get a Flood Barrier Recommendation →
Operational Readiness

Deployment, storage and training

Real flood protection depends on operational readiness — trained crews, planned storage, and a system that can be redeployed reliably across multiple flood seasons. Geodesign barriers are designed for exactly that.

Crew Training

Geodesign provides training for the deployment crew. The system is engineered to be set up by a trained team without specialised tools or machinery — supporting consistent, repeatable deployment across events.

  • Step-by-step assembly process
  • No specialised tools required
  • Trained crew model for repeatable deployment

Planned Storage

Components are stored in modular containers or on pallets between events. Storage footprint depends on linear length and series — your specialist provides exact figures during site planning so storage can be planned alongside the rest of your flood response.

  • Modular component storage
  • Container or pallet format
  • Footprint sized to linear length and series

Repeatable Redeployment

The system is engineered for repeated deployment across multiple flood events and flood seasons. Components can be inspected, stored, and redeployed — supporting long-term lifecycle performance and pre-flood-season preparation.

  • Reusable across multiple flood events
  • Inspectable, redeployable components
  • Supports pre-flood-season planning
Where we work

Partners and distributors

Geodesign is a manufacturer. Systems are shipped from Sweden and supported by our own offices and by agents and distributors who provide local guidance, site support and rapid response in their markets.

Europe

Head office and engineering in Sweden, an office in the United Kingdom, and distribution partners across western and central Europe.

  • Sweden — head office and manufacturing
  • United Kingdom, the Netherlands, Belgium
  • France, Switzerland, Poland

Asia-Pacific

Regional agents covering Australia and New Zealand, with a separate partner for China. Deployments include airport and municipal protection during prolonged regional flooding.

  • Australia and New Zealand
  • China
  • Other Asia-Pacific markets served from Sweden

Americas

Direct sales and stock in the United States, with an office in New York and a warehouse serving the Chicago area.

  • United States — direct
  • Canada and Latin America served from Sweden
  • Regional stock for faster response
No partner in your market yet?
Tell us where your site is and we will connect you with the nearest office or partner — or talk to you about becoming one.
Find your local contact →
Certifications & Testing

Independently verified to ANSI/FM 2510-2020

The Industrial and Heavy Duty series are independently tested and approved by FM Approvals to ANSI/FM 2510-2020. The standard is American; the approval is recognised by insurers and specifiers in many markets, and the full documentation is available for procurement and engineering review anywhere we ship.

Request certification documentation →
  • Third-party tested
  • ANSI/FM 2510-2020 — Industrial & Heavy Duty
  • Documentation on request
Track Record

Global deployment. Local reliability.

Field-proven flood protection across municipal, public-sector, and commercial environments worldwide.

Municipal readiness
30+ years
In the field

"Amazingly simple product that was easy to assemble and bring down and saved our CBD from flooding."

Ken Diehm
Chief Executive Officer, Fraser Coast Regional Council
Reference deployment: 400 m (1,300 ft) municipal system in Maryborough, Australia
Long-term public use
24 Countries
Deployments

"We decided to stay at home as we have full confidence in the barrier. It stood, rock solid on the new purpose built road surface."

Bob Herrick
Local resident, Ironbridge, UK
Reference deployment: Environment Agency, more than 40 km in service in the UK
Industrial site protection
164 km +
Deployed

"The Geodesign flood barrier system is incredibly robust, yet surprisingly simple to install. Seeing how seamlessly the pieces came together gave us real confidence that, with the right preparation and teamwork, we can protect the site and be ready for even the worst flood event."

Mehul Joshi
Senior Industrial Engineer, ASML
Reference deployment: 305 m (1,000 ft) of P101, ASML, USA.

Join these teams in protecting your site.

Get a Flood Barrier Recommendation →
Selected references

Who deploys Geodesign barriers

References include National Grid, SSE, EDF Energy, UK Power Networks, Network Rail, the Environment Agency, Duke Energy, Sonoco and ASML — utilities, rail operators, national agencies, local councils and industrial sites, across 24 countries and 30+ years.

Case Studies

Selected deployments and case studies

Read all articles →
USA

ASML Fortifies Silicon Valley Campus Against 500-Year Floods with FM Approved Industrial Barriers

In November 2024, ASML proactively safeguarded its San Jose R&D campus from potential 500-year flood events, deploying a FM Approved Geodesign Industrial barrier system tailored to the facility’s site conditions.

Australia

Maryborough Protects Its Town Centre with a 400 m Municipal Barrier

Fraser Coast Regional Council deployed a 400 m (1,300 ft) Geodesign system through the centre of Maryborough during Queensland flooding. In the council’s own words: an “amazingly simple product that was easy to assemble and bring down”.

Compare Systems

Comparing flood barrier options?

See how Geodesign deployable systems compare to sandbags, water-filled barriers, flood gates, and permanent flood walls — protection height, deployment speed, lifecycle cost, and site fit.

Compare Barrier Types →
FAQ

Frequently asked questions

Practical answers on series selection, deployment, certifications, storage, and quoting. Looking for broader comparisons against sandbags or flood walls? See the flood barrier comparison guide.

Which flood barrier series do I need?

Selection depends on your required protection height, site conditions and deployment scenario. Elemental (41–61 cm / 16–24 in) is intended for lower heights and rapid deployment. Industrial (61–121 cm / 24–48 in) is built for scalable municipal and commercial sites. Heavy Duty (122–245 cm / 48–96 in) is engineered for severe flood events, critical infrastructure and higher protection levels. A Geodesign specialist can recommend the right series after a short site review.

What protection heights are available?

Protection heights range from 41 cm (16 in) in the Elemental series up to 245 cm (96 in) in the Heavy Duty series. The right height depends on expected flood depth, wave action and site conditions — not all sites need the maximum height.

Are Geodesign flood barriers FM Approved?

The Industrial and Heavy Duty series are FM Approved to ANSI/FM 2510-2020, which provides independent third-party verification of structural performance under demanding flood conditions. ANSI/FM 2510-2020 is an American standard, and the approval is recognised by insurers and specifiers in many markets. Documentation can be provided on request for procurement and engineering review.

Do the barriers require anchoring?

No. Stability is achieved through system geometry, self-weight, and hydraulic loading. No permanent anchoring, excavation, or ground penetration is required under normal deployment. The system is designed for asphalt, concrete, gravel, compacted soil, and uneven ground.

Do the barriers require sand, water, or fill materials?

No. Geodesign is a no-fill, deployable system. There are no sandbags to fill, no water tanks to fill, and no on-site materials sourcing required to bring the system to operational state.

How fast can the system be deployed?

Deployment speed depends on barrier height, site access, alignment, crew size, and training. On planned sites, trained crews can deploy long barrier runs quickly and repeatably. For an estimate tailored to your site length and conditions, request a recommendation.

Can Geodesign help evaluate my site?

Yes. A Geodesign specialist will review your site conditions, expected flood profile, and operational requirements, and respond within two business days with a tailored recommendation — at no cost and with no obligation.

What information is needed for a quote?

For an accurate quote we typically need: target protection height, approximate barrier length in metres, site conditions (surface type, alignment, access), and your deployment timeline. Anything you don’t have yet is fine — your specialist will help fill in the gaps.

Are the barriers reusable?

Yes. Components are engineered for repeated deployment across multiple flood events and flood seasons. Project economics typically improve when a system is reused across multiple events rather than treated as single-use.

How are barriers stored and redeployed?

Components are stored in modular containers or on pallets between events. Storage footprint depends on linear length and series — your specialist can provide exact figures during site planning so storage can be planned alongside the rest of your flood response strategy.

What site conditions matter most?

Key factors include: surface (asphalt, concrete, gravel, compacted soil, uneven ground), alignment (straight, curved, with corners), expected water depth and wave action, site access during deployment, and proximity to buildings, utilities, and other obstacles. A site assessment captures all of these in one review.

Do you deliver outside Europe and North America?

Yes. Geodesign ships from Sweden and works through regional partners — today in the United Kingdom, the Netherlands, Switzerland, France, Poland, Australia, New Zealand and China — alongside our own offices in Sweden, the United Kingdom and the United States. Systems have been deployed in 24 countries. If there is no partner in your market yet, your enquiry is handled directly by the head office in Sweden. See our partners and offices for the current network.

Who installs the barrier and trains the crew?

Geodesign supplies the barrier system and the technical layout for your site. Installation, ground preparation and any pumping or drainage work are carried out by your own team or your contractor. Geodesign provides training for the deployment crew; the system is assembled by hand, without specialised tools or machinery.

How long does it take to set up, and how many people are needed?

We quote 100 m (330 ft) of barrier with a six-person crew. Elemental is up in 30 minutes, Industrial in 35 to 70 minutes, and Heavy Duty in 50 to 130 minutes, depending on the model. The full table by model is above. Actual time also depends on site access, the alignment of the line, and how often the crew has built it before — the second build is faster than the first.

Get Started

Ready to protect your site?

Tell us about your project and we'll recommend the right barrier series, walk you through site conditions, and respond with a tailored plan — all free of charge.

  • FM Approved systems
    Industrial and Heavy Duty certified to ANSI/FM 2510-2020 — verified performance under demanding flood conditions.
  • Response within two business days
    A Geodesign specialist will review your site and respond with a tailored recommendation.
  • Trusted by Exxon, Duke Energy & ASML
    Deployed across industrial, utility, and municipal sites in 24 countries.
  • 30+ years in the field
    More than 164 km of barrier deployed across municipal, commercial and industrial sites.