Heavy Duty
Australia
Cyclone Alfred in Brisbane: How Urban Utilities Kept Its Oxley Creek Plant Dry
As ex-Tropical Cyclone Alfred brought heavy rain to South East Queensland in March 2025, a 600-metre Geodesign Heavy Duty barrier erected before the forecast flood peak kept Urban Utilities' Oxley Creek plant dry and operating.
Read more
Australia
Rockhampton Flood 2026: Council Installs a Temporary Barrier Before the Fitzroy Peak
As floodwater moved down the Fitzroy River in January 2026, Rockhampton Regional Council installed a Geodesign temporary flood barrier on Water Street, Berserker, before the peak – ready if needed, removed once the risk passed.
Read more
Belgium
Flood Mitigation Strategies in Practice: Demountable Barriers on the Semois in Belgium
Local teams in the Belgian municipality of Vresse-sur-Semois used Geodesign's Heavy Duty C152 barrier during real high-water events on the Semois, then applied what they learned to improve their response.
Read more
France
Paris Flooding: How Enedis Protected an Underground Substation Beside the Seine
French electricity distributor Enedis used Geodesign's Heavy Duty C152 system, known in France as Aqua Barrière, to protect its underground Alma substation near the Pont de l'Alma in Paris.
Read more
France
Flood Protection for Commercial Buildings: TF1 Trains Its Teams at Its Headquarters
French broadcaster TF1 has trained its technical teams to install its new Heavy Duty C152 barriers around its Boulogne-Billancourt headquarters beside the Seine.
Read more
France
France Floods 2025: Louvigny’s Barrier Response During Storm Herminia
Storm Herminia brought heavy rain and river flooding to Normandy in late January 2025, prompting local authorities in Louvigny to deploy Geodesign barriers to protect homes and public areas.
Read more
Australia
Rockhampton Flood 2017: A Temporary Levee Keeps Berserker Homes Dry
As the Fitzroy River rose after ex-Tropical Cyclone Debbie in April 2017, a Geodesign temporary levee between the river and Berserker's streets in Rockhampton held back the floodwater and kept the protected side dry.
Read more
France
Louvigny’s Community Flood Exercise Keeps Its Barrier Team Ready
Regular drills keep Louvigny's municipal crews ready to raise the town's flood protection along the River Orne when upstream gauges signal a major flood.
Read more
Australia
Maryborough Floods: How Training Prepared the CBD’s Temporary Levee
Maryborough's CBD sits beside the Mary River and has flooded many times, so Fraser Coast Regional Council relies on a temporary levee and trained crews to protect it.
Read more
United Kingdom
River Severn Flooding: Heavy Duty Barriers Hold the Line at Ironbridge
River Severn flooding in early January 2024 tested the temporary flood defences in Ironbridge, Shropshire, where the Environment Agency had set up Geodesign barriers along the Wharfage.
Read more