News

Berserker’s Geodesign Barrier Shields Rockhampton Homes from Historic Flood (1) Australia

A temporary levee protects homes in Berserker during a major Fitzroy River flood

As the Fitzroy River rose towards a historic peak after ex-Cyclone Debbie, a Geodesign Heavy Duty barrier protected homes and businesses in Berserker, a suburb of Rockhampton. The protected side stayed dry, with minor seepage handled by the stormwater system.

Read more
Louvigny Demonstrates the Effectiveness of Geodesign Barriers in Flood Defense Exercises-1 France

Designing for a 100-year flood: Louvigny tests its barrier line

Every two years, the town of Louvigny in Normandy sets up and dismantles its 500-metre Geodesign Heavy Duty barrier line, known locally as Aqua Barrière. The exercise checks equipment and teams against a flood that is expected once a century.

Read more
Securing Maryborough’s CBD- A Chronicle of Flood Preparedness and Resilient Defense (1) Australia

Flood resilience in Maryborough: how training prepared a city centre levee

Maryborough in Queensland protects its central business district with a 2.4-metre Geodesign Heavy Duty temporary levee. Training that began in 2019 meant the council could erect it quickly when floodwater threatened.

Read more
Geodesign Flood Barriers Prove Effective in Ironbridge Amidst Severn Surge United Kingdom

River flood barriers hold back the Severn at Ironbridge

When the River Severn rose after a wet Christmas, Environment Agency teams had already installed Geodesign Heavy Duty barriers along the Wharfage in Ironbridge. The river peaked at 6.33 metres at the Buildwas gauge – and the barriers held.

Read more
Oxford, Oxfordshire, UK - January 7, 2024: UK Prime Minister Rishi Sunak (right) engages in discussion with Environment Agency personnel Robbie Williams and Anna Burns while examining flood defense measures in Oxford. The city recently experienced severe flooding due to the heavy rainfall from Storm Henk. United Kingdom

City flood protection in Oxford: temporary barriers in focus during Storm Henk

In January 2024, the then UK Prime Minister Rishi Sunak visited Oxford after Storm Henk to see the flood response. The Environment Agency's Geodesign Heavy Duty barriers, used in the city since 2008, were part of the defences on show.

Read more
Charleville’s Levee Stands Firm Amidst Queensland’s Flood Crisis – 0 Australia

Charleville’s flood levee holds as the Warrego River rises again

In February 2012, Charleville in south-west Queensland again faced floodwater from the Warrego River. With its permanent levee still under construction, the town relied on a Geodesign Heavy Duty temporary levee – and the barrier held.

Read more
Charleville Breathes Easy Behind Geodesign Barriers’ Levee Australia

Rapid flood barrier deployment saves Charleville from the Warrego River

In January 2008, a team led by Geodesign representative Clay Griffin worked through the night with local volunteers to build a temporary levee in Charleville. When the Warrego River peaked, the levee held.

Read more
Innovative Geodesign Barriers Shield Substation from Flood, Keeping Lights on for Thousands – 6 United Kingdom

Substation flooding at Walham: how temporary barriers kept the power on

In the summer floods of 2007, emergency services used Geodesign barriers to protect the Walham electrical switching station in Gloucestershire. The station, which supplies more than 600,000 people, stayed in operation.

Read more
Witney Welcomes Prime Minister to Showcase Geodesign Barrier’s Potential United Kingdom

Community flood barrier in Witney: residents trained to deploy their own protection

In Witney, Oxfordshire, residents received their own temporary Geodesign barrier and learned to install it. The training day was attended by David Cameron, then Prime Minister and the local Member of Parliament.

Read more
Ironbridge Battles the Elements – Unprecedented Flooding Challenges Resilience United Kingdom

Flood barrier inspection at Ironbridge: lessons from three storms in 2020

In February 2020, storms Ciara, Dennis and Jorge brought flooding on an unprecedented scale to Ironbridge. The Environment Agency's Heavy Duty C122 and C184 barriers stayed in place for three weeks – and a joint inspection showed how to make them work even better.

Read more